Set Linkage
Posted by i3Teamworks Admin on 29 Mar 2019

This is an optional setting. Define the duration for each Linkage.

1. From your Main Dashboard , select Works and then select Work Flow

2. Tap on

3. Click on   and

  • Link To - Choose the Linkage Item
  • Filter - Set the time frame / duration. eg -3 Months. Meaning you may link the Work Flow with tasks from the last 3 months up to current date.

 Setting sample as below:

**From here you may update the Linkage setting, whether to remove (Delete) or to change the setting limit (Edit)