Setting
Work Culture > Work Flow > Setting
Set Linkage
Posted by i3Teamworks Admin on 29 Mar 2019
This is an optional setting. Define the duration for each Linkage.
1. From your Main Dashboard , select Works and then select Work Flow
2. Tap on
3. Click on and
- Link To - Choose the Linkage Item
- Filter - Set the time frame / duration. eg -3 Months. Meaning you may link the Work Flow with tasks from the last 3 months up to current date.
Setting sample as below:
**From here you may update the Linkage setting, whether to remove (Delete) or to change the setting limit (Edit)